La Fe dam seismic vulnerability study

Client: I PRESAS

Description of works executed:

  • Tectonic seismic interpretation.
  • Seismological background.
  • Seismic hazard determination.

Seismic vulnerability study of Coltejer building

Client: EDIFICIO CENTRO COLTEJER P.H.

Description of works executed:

  • Exploration work. On-site tests. Geotechnical exploration
  • Determination of building behavior in the event of earthquakes with different return periods, and determination of displacements through models, including materials properties, by means of a static, dynamic and non-linear static (pushover) seismic analysis.

Environmental studies

El Sireno hydroelectric project (150 MW)

Client: EPM

Description of works executed:

Studies to evaluate the hydroelectric potential of the Penderisco River Basin, and the technical, economic and environmental feasibility of the best project.

Sabio Caldas hydroelectric project (27 MW)

Client: MINCIVIL

Description of works executed:

Technical and Environmental Studies.

Francisco Javier Cisneros hydroelectric project
(19.3 MW)

Client: MINCIVIL

Description of works executed:

Technical and Environmental Studies.

Alejandro López and José María Villa hydroelectric project (23.65-23 MW)

Client: MINCIVIL

Description of works executed:

  • Study Permit.
  • Technical and Environmental Studies.

La Miel hydroelectric project (19,9 MW)

Client: INGENIERÍA ALIADAS

Description of works executed:

Environmental Diagnosis of Alternatives.

Chorreritas hydroelectric project (19,9 MW)

Client: INGENIERÍA ALIADAS Description of works executed: EIA Complement.

Nechi river basin hydroelectric project
(100 MW)

Client: SP INGENIEROS

Description of works executed:

  • Environmental Diagnosis of Alternatives Exemption El Oso Hydroelectric Project (62.3 MW).
  • Environmental Diagnosis of Alternatives La Esperanza Hydroelectric Project (43.7 MW).
  • Environmental Diagnosis of Alternatives Exemption Campamento Hydroelectric Project (99.6 MW).
  • Environmental Impact Assessment-EIA- Campamento Hydroelectric Project (99.6 MW).

Escuela de Minas hydroelectric power plant (60 MW)

Client: HIDRALPOR

Description of works executed:

  • Environmental Diagnosis of Alternatives.
  • Environment Effect Study.
  • Environmental license granted by CORNARE.

Nudos hydroelectric power plant (60 MW)

Client: HIDRALPOR

Description of works executed:

  • Environmental Diagnosis of Alternatives.
  • Environment Effect Study.
  • Environmental license granted by CORANTIOQUIA

Salamina hydroelectric project (19 MW)

Client: AKUO

Description of works executed:

Environmental Diagnosis of Alternatives exemption.

Cisneros project - Guayabito deposit

Client: ANTIOQUIA GOLD

Description of works executed:

Environment Effect Study. Environmental license granted by CORNARE.

Hydrogeological studies

Pacifico road concession 2 - Mulatos tunnel

Client: LA PINTADA ROAD CONCESSION

Description of works executed:

Calibration and modeling of hydrogeological model.

La Sinifaná coal basin

Client: MINISTRY OF MINES AND ENERGY

Description of works executed:

Hydrogeological Study to obtain a Conceptual Model to understand the functioning of aquifers intervened by coal exploitation activities, and to determine the technical activities to prevent the occurrence of new accidents in the municipalities of Angelópolis, Titiribí and Venecia.

Below are the areas intervened in each municipality:

  • Angelópolis: 86 km2.
  • Titiribí:142 km2.
  • Venecia: 141 km2.

Santana - Mocoa - Neiva project (EPC)

Client: CONSORCIO C&M SAN AGUSTÍN

Description of works executed:

Studies for hydrogeological characterization of the area of influence of the Villa Garzón, Puerto Caicedo, Timaná and Mocoa relief roads.

Technical due diligences (DUE DILIGENCE)

Florida hydroelectric use project

Client: MGM INNOVA CAPITAL COLOMBIA S.A.S.

Description of works executed:

Initial revision of available project information and technical visit to work sites. Detailed revision of information: Available cartography on the location of the hydroelectric development, geological and geotechnical studies, hydrology, energy and power studies, general configuration of project and works thereof, electrical and mechanical generation equipment, and works budget.

Understanding / Consultancy small hydroelectric power plants projects

Client: BANCOLOMBIA

Description of works executed:

Evaluation of 28 hydroelectric projects (Small Hydroelectric Power Plants), operational in Colombia and registered with UPME.

PCH Patico II small hydroelectric power plant

Client: MGM INNOVA CAPITAL COLOMBIA S.A.S.

Description of works executed:

  • Revision and validation of information available on the project.
  • Technical visit to works sites.
  • Technical validation of the project’s civil works.
  • Technical validation of the project’s electrical and mechanical generation equipment.
  • Validation of work quantities, execution schedule and budget (in conjunction with Morichal).
  • Revision of the scope presented in the EIA in relation to the abiotic environment.

PCH Yeguas small hydroelectric power plant

Client: AKUO

Description of works executed:

  • Revision of information available on the project. 
  • Technical visit to works sites.
  • Technical validation of the project’s civil works.
  • Technical validation of electrical and mechanical equipment. 
  • Revision of work quantities, execution schedule and budget.

San Alberto hydroelectric project

Client: CENTRAL ENERGY

Description of works executed:

  • Revision of information available on the project.
  • Technical visit to works sites.
  • Preparation of the basic scheme (“Lay Out”) of the project works.
  • Validation of basic information and proposal of the general configuration of the project’s works.
  • Technical validation of electrical and mechanical equipment. 
  • Revision of work quantities, execution schedule and budget.

Nine small hydroelectric plants

Client: ISAGEN

Description of works executed:

  • Revision of information available on each project. 
  • Technical visit to works sites. 
  • Technical validation of the project’s civil works.
  • Technical validation of electrical and mechanical equipment. 
  • Revision of work quantities, execution schedule and budget.

San Bartolomé and Oibita hydroelectric projects

Client: ISAGEN

Description of works executed:

  • Revision of information available on each project. 
  • Intake area.
  • Load tunnels of San Bartolomé and Oibita projects.
  • Slopes in the power house sector and pressure pipe slope of San Bartolomé and Oibita projects.
  • Electrical and Mechanical equipment.

Río Aures hydroelectric project

Client: AURES BAJO S.A.S. E.S.P

Description of works executed:

  • Initial revision of information available.
  • Technical visit to works sites.
  • Revision of basic studies.
  • Revision of the general configuration and of the project´s  works.
  • Revision of the electrical and mechanical generation equipment.
  • Budget revision. Value of new designs.